The Myrtle
Avenue overpass. The RR ROW passes under the bridge, which carries
the Avenue above. Rail road tracks and ties were removed from this
area.
A large cement
retaining wall was built along the western portion of the ROW in this area.
A fence was built on top of the retaining wall. There is a lot of
land between the tracks and the wall in this area.
Forrest
Park Road overpass. It seems that there was a lot of cement used
to construct this bridge. All of the steel beams are covered with
cement; a very different construction method utilized for this bridge when
compared to other bridges along the route.